Moisture insulation now complete on the terrace side

The construction manager of Maisons de la Côte Atlantique (MCA) has contacted us with very good news:

The moisture insulation is now also completely done on the terrace side of the house up to the base of the foundation. We are glad that we can rely on the site manager - and that he sent us the pictures.

A final check of the moisture insulation by us is still pending, we are pleased initially this step has worked well.

Rubbish removed from the vide-sanitaire

In addition, the site manager of MCA informs us that the garbage has been removed from our vide-sanitaire. Again, we are still awaiting verification. We are in good spirits that everything is in order.